Monitoring & Plant Optimisation Service:a thorough investigation of your systems/operations

Once the system commences monitoring, In-Site personnel can analyse data and compile a detailed report identifying

1

Which cleans do not comply with the site’s quality spec

we detail non-compliance per item cleaned

more
2

Current cost to clean each separate item

detailing average, minimum and maximum costs incurred

more
3

Current CO2 emissions of each separate item cleaned

detailing average, minimum and maximum emissions

more
4

Effectiveness (or otherwise) of interface detection

during pre-rinse/detergent & detergent/post rinse cycles.

more
5

Is circuit properly rinsed prior to addition of biocide?

analyse temperature, conductivity, pH values

more
6

What was CIP temperature on completion of program?

does temperature confirm/signify adequate rinsing

more
7

Non-operation or poor sequencing of plant items

typically, does sanitiser dosing pump/dosing valve operate in unison, is the circuit being 'dead-ended'.

more
8

Amount of time/frequency CIP HOLD/ALARM is triggered

per separate item cleaned, i.e. is an ALARM predictable

more
9

Average duration of each clean

reporting also on longest/shortest cleaning times achieved.

more
10

Are cleans being truncated, are set-points modified

i.e. are operators having an influence on CIP performance

more
11

If cleans ‘FAIL’ or do not complete all CIP stages

are re-cleans being carried out

more
12

Are program 'inhibits' operating

do CIP stages meet minimum duration periods relative to achievement of temperature, conductivity, flow  etc.

more
13

Is the ‘true circuit’ time in accordance with actual program valve sequencing

e.g. does detergent recovery open/close too late/ too soon

more
14

Identify areas of wastage

typically excessive rinse times, poor interface causing cooling/dilution of detergent tanks

more
15

Project potential annual savings

by cost element, e.g. water, electricity, chemical, etc.

more

and summarise corrective actions needed to optimise plant performance/operations as identified above

More details

and related pages