cost case study 1

Copyright © 2005
In-Site Control Ltd

After scenario:

The Operations & Times report of the same plant items during a 6 week period after the software program was modified.

Total number of CIP operations carried out was 387, overall duration = 321.4 hrs. Cold liquor (water) usage of 49.84 hrs cost £1,299 during the above 6 week analysis period, (£216/week) representing an annual water saving of £12,610.

Before scenario:

The above table shows the Operations & Times of plant items during a 6 week period before the software program was modified.

Total number of CIP operations carried out was 368, overall duration = 291.4 hrs. Cold liquor (water) usage of 105.69 hrs cost £2,754 during the 6 week analysis period, (£459/week).

More details

and related pages

Case Study No.1 reduction in water usage in excess of 50% by optimising CIP operating program.